S4, Ep41 We Finally Fixed It — Liveaboard Sailboat Plumbing Done Right
20 de octubre de 2025 · 29 min · 598 vistas · San Diego
¿Qué cubre este video?
The crew of *Into the Mystic* upgrades their black water plumbing system to enable offshore discharge and eliminate odors.3:06 They replace permeable hoses with marine-grade sanitation hose, install an inline charcoal filter on the vent line, and add a macerator pump with a Y-valve for overboard discharge.4:32 Because the original hose routing was inaccessible behind cabinetry, the crew cuts access holes in the paneling to pull the old lines and install the new, stiffer hose.9:50 Additionally, the crew attempts to upgrade their primary anchor chain from 140 feet to 300 feet to prepare for cruising.16:07 They purchase new chain, but discover after installation that the link dimensions are incompatible with their existing windlass, causing the chain to skip under load.22:18 They revert to the original chain, adding 50 feet of nylon rode for emergency release.24:44 The crew also recovers a lost Dodger panel from the seafloor using a weighted hook and drag technique.12:11 Proper hose selection and verifying chain-to-windlass compatibility are essential for reliable sanitation and anchoring systems.
Más de Sailing Into the Mystic
De Sailing Into the Mystic — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



