NEW [permanent] CREW member!! [ep 91]
22 de noviembre de 2023 · 18 min · 194K vistas
¿Qué cubre este video?
A boat owner and her father perform several maintenance projects while the vessel is hauled out in a boatyard in Grenada. The primary tasks include installing a Hydrovane self-steering system, which requires measuring and fitting custom stainless steel brackets, drilling mounting holes, and sealing with 3M 5200.3:03 The crew also reseals the bolted-on keel by removing old caulking and sanding the joint to address moisture and rust.2:01 Additional work involves replacing underwater lights with Lumitech units and replacing a shaft seal.9:01 The shaft coupling installation, previously a multi-day struggle, is completed by sanding the shaft and applying soap to facilitate sliding the coupling into place.16:57 The yard stay is complicated by intermittent rain, requiring the crew to alternate between exterior projects and interior tasks.12:42
Barcos en este video
Más de Lauren Landers Sailing
De Lauren Landers Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



