Sailing Squibvideo

Squib's Refit - Roof support completion - Outboard motor mount - Finalizing the hull /84

12 de septiembre de 2024 · 17 min · 839 vistas

¿Qué cubre este video?

Peter and Sabina perform several structural and cosmetic refit tasks on their boat, *Squib*. To support a 2.5-kilowatt electric outboard motor, Peter constructs a reinforced mounting bracket using epoxy and wooden dowels for added shear strength.1:34 He drills parallel holes with a drill press, bonds the assembly with thickened epoxy, and plans to finish the mount with fiberglass matting for waterproofing.1:53 Simultaneously, the crew modifies the roof support structure by replacing a temporary wooden brace with a permanent epoxy-bonded pedestal, using plastic film to prevent the stainless steel column from adhering to the base during the curing process.5:41

Cosmetic work includes sanding the hull with 400-grit paper to remove dust particles and debris from the previous paint application.12:11 Sabina prepares the deck for KiwiGrip application by filling and smoothing surfaces.15:16 Additionally, Peter reinforces the anchor locker lid with extra epoxy to correct a 3-millimeter clearance issue.14:21 The crew also begins creating templates for new cockpit flooring using heavy-duty plastic sheeting.17:03

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sep 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema