Sailing Into the Mysticvideo

S1, Ep9 Time for Boat Projects on the Mystic

18 de enero de 2025 · 19 min · 170 vistas · San Diego

¿Qué cubre este video?

Replacing the rope-style rudder seal on the 38-ft sailboat *Into the Mystic* requires accessing the rudder post through a panel in the rear cabin.1:21 After removing the jam nut, the old seal is extracted using a pick tool.2:45 The shaft is cleaned with a wire brush and sanded to remove burrs.3:53 A new rope seal is cut to length and wrapped around the shaft, with the seam of the second seal offset 180 degrees from the first to ensure a proper fit.5:32 The cap is tightened to seat the seals, and new hose clamps are installed.10:11

Separately, the crew replaces the headsail after a gust of wind shreds the original during a towing incident in San Diego Bay.12:16 A new block is installed on the railing to improve the furling line lead.12:53 Finally, a neighbor assists in climbing the mast to retrieve a tangled flag and inspect the masthead light.16:01

Replacing the rudder seal while the boat is in the water serves as a temporary repair until the vessel can be hauled for a full hose replacement.4:47

Ver en YouTube

Más de Sailing Into the Mystic

Tim's Favorite Anchorage in All of Baja | Agua Verde [Ep68]sep 2026After Our Dinghy Was Stolen, We found Paradise! [Ep67]sep 2026We Left La Paz to Heal | Provisioning for Paradise [Ep66]sep 2026Disaster in La Paz: Where is our Dinghy? [Ep 65]ago 2026

De Sailing Into the Mystic — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema