Sailing Zephyrvideo
No Wind, Cargo Ships, Engine Trouble and an Unexpected Surprise - Ep. 69
18 de febrero de 2021 · 18 min · 9K vistas · Malta
¿Qué cubre este video?
The crew of the 360-mile passage from Pylos, Greece, to Malta aboard the sailboat Zephyr reports engine hesitation and a false distress signal during the two-day, 13-hour transit.5:59 The engine experienced intermittent power loss while motoring in light winds, prompting the crew to monitor the fuel-water separator for sediment.5:03 During the crossing, the crew monitored a radio distress call from a 15-meter vessel claiming to be sinking, which proved to be a request for diesel fuel.8:03 Upon arrival in Malta, the crew navigated a dense field of anchored tankers before clearing customs in Valletta.0:15 Maintenance tasks included cleaning the fuel-water separator after 18 months of engine use.5:08 Shore-side activities included hiking to Nestor's Cave and visiting the Saluting Battery in Valletta to observe the daily firing of a 32-pounder cannon.16:10 The passage concluded with the crew anchoring in confused seas near the capital.9:16
Más de Sailing Zephyr
De Sailing Zephyr — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



