Catamaran Mistertong video
#210 Our biggest project to date
18 de abril de 2026 · 50 min · 7K vistas
¿Qué cubre este video?
Djé and Nad continue a major structural refit on their Outremer catamaran, focusing on the nacelle and cockpit storage areas over a three-day period. The work involves fabricating and installing new solid wood components, including structural gutters and a custom storage locker door.1:58 To ensure precise fitment of the nacelle’s forward section, the crew uses a plastic template to trace the exact shape before cutting the plywood.17:38 They employ scarf joints to maximize surface area for bonding and use 250g fiberglass cloth for structural reinforcement.2:04 The team prioritizes sealing the structure against weather, working around frequent rain squalls and high winds that reach 32–33 knots.2:44 They prepare multiple components for bonding, including pre-laminating sections that will reside inside the lockers to simplify later installation.6:32 The project remains on schedule despite the need for additional, unplanned repairs discovered during the process.30:04
Más de Catamaran Mistertong
De Catamaran Mistertong — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



