Sailing Squibvideo

Squib's Refit - Starting new galley - Sanding hull - New navigation lights /80

15 de agosto de 2024 · 19 min · 942 vistas

¿Qué cubre este video?

The refit of the 43-year-old vessel Squib involves extensive hull preparation, interior cabinetry installation, and electrical upgrades. Peter and Sabina sand the entire hull by hand and with power tools to prepare the surface for a white paint finish, which they select for its heat-reflective properties in Mediterranean climates.5:49 The crew installs a new custom-built storage unit beneath the freezer box in the galley, requiring precise modifications to accommodate the non-parallel bulkheads and curved hull geometry.17:18 Peter also cuts new openings in the deckhouse to mount navigation lights, utilizing Amaflex insulation behind the mounting points.0:36 Additional maintenance includes cleaning and painting the anchor locker and forward storage compartments with bilge paint after removing old, improperly applied silicone seals.7:15 The project involves significant structural adjustments to the galley layout to optimize space for a stove and refrigerator, requiring iterative measurements and template creation to account for the lack of square angles in the cabin.17:18

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sep 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema