Sailing Squibvideo

Squib's Refit - Laying the gas pipe - Adjusting the kitchen countertop - Finishing the cockpit /112

27 de marzo de 2025 · 15 min · 739 vistas

¿Qué cubre este video?

The refit of the vessel Squib involves installing a copper gas line, modifying the galley countertop, and finishing cockpit surfaces. To route the gas line, the crew bends 10mm copper tubing to pass through a bulkhead and connect to a remote shut-off valve.1:03 The installation requires precise U-bends to clear structural obstacles, with the crew using specialized copper-bending tools.2:54 In the galley, a misaligned wall causes the countertop to overlap by several millimeters, preventing the gimbaled stove from swinging freely.5:06 The crew trims the countertop and removes an epoxy-bonded trim strip to create necessary clearance.6:23 Additionally, the crew reinforces laminated bulkheads by drilling reference holes and bolting them from below.7:30 Cockpit work includes sanding and fairing the rear bulkhead and door fittings using a Makita 50-30 angle grinder.12:13 The crew also organizes the salon to manage tools and materials, while continuing to fair a mounting bracket for an electric outboard motor.14:48 Future tasks include positioning the diesel tank and locating a missing bulkhead fitting.15:32

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sep 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema