Project Brupegvideo
What's next for Project Brupeg? - Ep. 384
22 de diciembre de 2024 · 28 min · 24K vistas
¿Qué cubre este video?
The 10-year rebuild of the former fishing trawler *Brupeg* continues with several mechanical and structural upgrades to prepare for upcoming coastal and international voyages.0:22 The crew is installing two new 24-volt winches, each with a 6-tonne lifting capacity and Dyneema line, to manage the vessel’s stabilizer wings.0:50 These winches feature ratcheting mechanical brakes to prevent heat buildup and potential rope failure during deployment.2:09 Plans are underway to weld davits to the stern for easier dinghy and Laser sailboat transport, while a crane donated for the wheelhouse roof will facilitate lifting a future dive tender.15:44 Engine room improvements include wrapping the generator exhaust to manage heat and installing a custom-welded coolant expansion tank to reduce stress on keel-cooling pipes.17:29 Additionally, the vessel’s "BruNet" control system is transitioning from a prototype board to a production-ready unit, enabling future vegetable oil fuel conversion.20:40 The crew is also preparing for a potential coral reef mapping and technical diving project in Indonesia, which may require the construction of a specialized diving platform or elevator.22:52
Más de Project Brupeg
De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



