RAN Sailingvideo

The First Actual Piece Of Our 50 Ft Sailboat - Ep. 340 RAN Sailing

24 de marzo de 2023 · 19 min · 104K vistas · Skåne

¿Qué cubre este video?

Johan and Malin repair a leaking barn roof in Sweden by replacing six asbestos-containing panels using a rented 18-meter skylift.3:42 They dispose of the hazardous material at a designated municipal facility.4:02 Following the roof repair, Johan begins constructing the stem for a 50-foot wooden sailboat.8:48 He selects oak timber from his existing stock, planing six planks to 40-millimeter thickness before gluing them into a 120-millimeter-thick assembly using epoxy.9:12 To ensure structural accuracy, he uses a Shaper Origin handheld CNC router to cut the stem’s curved profile, performing a partial-depth cut with the router and finishing the remaining thickness with a jigsaw and a flush-trim bit.14:37 He secures the laminated pieces with screws and clamps during the 24-hour epoxy curing process.17:12 The project concludes with the stem assembly ready for final beveling.17:53

Ver en YouTube

Más de RAN Sailing

How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingago 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailingago 2026From Laser Precision to Endless Sanding - Ep. 497 Ran Sailingjul 2026Is This The Detail The Boat Has Been Waiting For? - Ep. 496 Ran Sailingjul 2026

De RAN Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema