Sailing Squibvideo

Squib's Refit - Stern light installation - Preparation for Kiwigrip 2 - Windpilot console installation /94

21 de noviembre de 2024 · 19 min · 921 vistas

¿Qué cubre este video?

The crew of the sailboat *Squib* performs several deck maintenance and refit tasks, including installing a stern light, applying KiwiGrip non-skid coating, and preparing a mounting console for a Windpilot self-steering system. To install the stern light, the crew routes a two-wire lead to the stern arch, crimps the connections, and seals the housing.1:03 Before applying KiwiGrip to the side decks and cabin roof, the crew masks off all deck hardware and fittings using painter's tape.3:39 They apply the non-skid compound by squeezing it directly from the pouch onto the deck and spreading it with a roller, noting that the material cures faster in warmer temperatures.13:34 Additionally, the crew marks and drills a hole for the holding tank pump-out deck fitting.9:37 For the Windpilot installation, the owner drills mounting holes through the stern platform, reinforces the underside with laminated wood, and fills the holes with thickened epoxy to prevent water ingress before final bolting.15:12

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sep 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema