Sam Holmes Sailingvideo
Internal halyards and chopping the whisker pole
14 de febrero de 2021 · 10 min · 36K vistas
¿Qué cubre este video?
Sam Holmes installs four internal halyard exits in a mast by 3D printing plastic templates to guide the cutouts.Watch He drills and taps holes for the exit boxes, staggering their positions to maintain mast structural integrity.Watch To prevent galvanic corrosion between the stainless steel hardware and the aluminum mast, he applies Lanacote, noting its consistency is softer and stickier than Tefgel.3:56 After fishing the jib, main, and spinnaker halyards through the mast using a messenger line, he removes external halyard hooks that previously snagged on rigging.3:08 He also repairs a bent whisker pole by cutting out the damaged section, rounding the tube in a vise, and securing the end fitting with machine screws instead of rivets.8:34 This modification shortens the pole by approximately two feet.8:44 Finally, he replaces a corroded masthead fitting with a thicker aluminum plate to accommodate a VHF antenna, navigation light, and camera mount.8:02
Más de Sam Holmes Sailing
De Sam Holmes Sailing — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



