Project Brupegvideo
Final Wing & Hinge Fabrication - Project Brupeg Ep. 138
30 de abril de 2020 · 45 min · 42K vistas
¿Qué cubre este video?
Fabrication of custom wing structures for a converted fishing trawler requires precise hinge alignment and structural reinforcement to manage thrust loads. To ensure the wings remain stable during both forward and reverse movement, the crew modifies the stainless steel hinge assemblies to function as thrust bearings.9:03 They weld triangular gussets made of 2205 stainless steel to the hinges, triangulating the load against the hull’s doubler plates to prevent sideways movement and mechanical binding.33:36 Because the hinges possess inherent slop, the team intentionally misaligns them slightly during the tack-welding process; this ensures the wings fit loosely when deployed but tighten as they reach the fully lowered position, preventing vibration and clanking while underway.23:30 The project involves extensive grinding and cutting of thick stainless plate using 5-inch angle grinders with 1mm cut-off discs, as the material exceeds the capacity of their plasma cutter.17:00 Proper alignment and reinforcement of these heavy-duty hinges are essential for long-term durability in a marine environment.
Más de Project Brupeg
De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



