Sailing Avantivideo

Last day in Chagos planning our crossing to Madagascar EP118

22 de agosto de 2024 · 10 min · 1K vistas · Chagos Archipelago

¿Qué cubre este video?

Gerard and Jacqueline prepare Avanti for an 11-day passage from the Chagos Archipelago to Madagascar.9:31 Before departure, Gerard reinforces the rig by installing a jury stay to supplement a forward lower stay that has one broken strand.7:12 He secures the new stay at the mast spreaders and anchors it to the toe rail using 8mm Dyneema line, three U-bolts, and six strands of GP12 Dyneema.8:24 The crew positions the U-bolts near the bulkheads to maximize structural strength.8:33 The planned route involves sailing southwest to navigate a gap in the Mascarene Plateau, followed by a transit through the compression zone toward Cap d'Ambre, Madagascar, before arriving at Nosy Be.9:55 The crew anticipates favorable southeast trade winds and a full moon for the initial nights of the crossing.9:31 The final day in Chagos includes snorkeling near coral bommies and observing local wildlife, including coconut crabs and bird populations on the windward side of the atoll.0:20

Ver en YouTube

Más de Sailing Avanti

CIRCUMNAVIGATED - WE DID IT EP136ene 2025WILD COAST sailing EP135ene 2025Sailing from Richards Bay to Durban in December EP134ene 2025Trying to leave Richardsbay EP133dic 2024

De Sailing Avanti — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema