MJ Sailingvideo

From Empty Shell to Cozy Home: Catamaran Interior Time-Lapse (MJ Sailing - Ep 349)

30 de noviembre de 2024 · 22 min · 44K vistas

¿Qué cubre este video?

Matt and Jessica continue the interior build of their custom catamaran, focusing on painting the master hull and finishing the rift-cut white oak trim. The project requires maintaining a minimum temperature of 55 degrees Fahrenheit (15 degrees Celsius) for the Alexseal primer to cure properly, complicating work during a winter cold spell. After applying a coat of primer, the team discovered high and low spots requiring additional sanding and a second coat.1:32 Furthermore, paint leaked behind the tape protecting the white oak trim, necessitating a change in finishing strategy.2:16 Instead of a multi-coat varnish, they opted to seal the wood with epoxy to fill gaps and highlight the grain, adding several days of prep work to the schedule.2:44 The interior build process involves extensive fairing and sanding, with the team transitioning from manual sanding in tight spaces to more efficient orbital methods.21:55 Painting remains the primary hurdle before moving to final installations.22:06

Ver en YouTube

Más de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljun 2026

De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema