Chez Teamvideo
About to miss the weather window for the New York passage | Episode 74 - Chez Team
17 de agosto de 2025 · 49 min · 52K vistas · Miami
¿Qué cubre este video?
The crew of a cruising sailboat prepares for a seven-day offshore passage from Key Biscayne, Florida, to New York by performing maintenance and safety upgrades. To improve hull speed, they use new scuba gear to clean algae from the bottom of the hull.12:45 They install a new generator, which they test by running the boat's air conditioning systems.5:54 For offshore safety, they relocate the life raft from the bow to the stern for better accessibility and begin assembling a ditch bag.33:38 They also install a telescopic whisker pole to manage the genoa during downwind sailing and modify the davits to secure the dinghy outboard motor for the transit.18:25 While anchored in No Name Harbor, the crew monitors a weather front bringing 28-knot winds and observes increased boat traffic and Coast Guard activity.24:59 After receiving final battery shipments, they finalize the stowage of the dinghy and prepare for departure.43:45
Más de Chez Team
De Chez Team — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



