Project Brupegvideo
Finishing the Davits - Project Brupeg Ep. 390
4 de febrero de 2025 · 32 min · 19K vistas
¿Qué cubre este video?
To complete the davit system on the 10-year rebuild of the fishing trawler Brupeg, the crew fabricates stainless steel bracing and installs custom lifting points on the dinghy.0:10 To prevent structural twisting, they weld 25mm by 3mm 304 stainless flat bar as tension-based gussets between the davit beam and the vessel's roof.2:24 The team also welds four aluminum lifting tags to the dinghy’s hull, using an AC TIG welder with a 2.4mm electrode to ensure a secure, self-leveling lift.11:05 After addressing a loose five-pin plug in the TIG torch, the crew splices Dyneema lines to connect the dinghy to the davit pulleys, using a custom fid to create a secure, knotless connection finished with UV-resistant covers and industrial stitching.5:15 The project concludes with the identification of coolant leaks in the generator’s piping, which show signs of corrosion after 260 hours of operation.29:06 Proper tension-based bracing and precise aluminum welding are essential for creating a stable, self-leveling dinghy lifting system.
Más de Project Brupeg
De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



