PAT | FRANKIEvideo

Progress in the yard, farewell at the dock | BOAT DAMAGE DISASTER Part 7

8 de diciembre de 2024 · 12 min · 20K vistas

¿Qué cubre este video?

Structural repairs on the sailboat remain stalled as the owners await insurance approval for the next phase of work. To assess the extent of the damage, surveyors drilled 14 holes into the hull’s stringers to inspect the bonding between the carbon fiber frames and the underlying material.2:12 These tests confirmed that the frames were not fully bonded, a condition the surveyors noted as common in many vessels.2:50 The material samples were sent to a laboratory in Germany for analysis.3:17 While the owners wait for the insurance company to finalize payment for the damage assessment and approve the repair costs, the repair yard has begun preliminary work, including sanding the hull to prepare the surface for new epoxy and structural reinforcement.10:36 Meanwhile, the owners assisted a friend, Kerry, with provisioning and meal preparation for his upcoming Atlantic crossing.5:05 The repair process involves ongoing coordination between the owners, an engineer, surveyors, and local contractors to determine the most effective structural solution.4:33

Ver en YouTube

Más de PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingjun 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape Verdemay 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1abr 2025The ULTIMATE Shakedown Sailfeb 2025

De PAT | FRANKIE — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema