Tips from a Shipwrightvideo

Building Orca - Episode 15: Transom Framework

7 de julio de 2025 · 20 min · 26K vistas

¿Qué cubre este video?

Louis Sauzedde constructs the transom framework for the boat Orca, focusing on the assembly of vertical frames to the bottom structural piece.4:03 To ensure structural integrity, Sauzedde employs an overlap joint rather than a deep slot, which preserves the strength of the bottom timber.4:17 He cuts a slight angle into the joint, creating a mechanical lock that tightens if the transom sustains an impact.5:35 The assembly process involves fastening the components with number 24 bronze wood screws, requiring the framework to be tipped on edge to allow for sufficient force during installation.2:42 Sauzedde leaves the vertical frames intentionally long to accommodate future beveling, which he plans to determine by fitting the next hull section or using a bevel board technique.12:19 A temporary cross-brace stabilizes the perimeter until the cedar planking is applied, at which point the structure will gain permanent rigidity.18:36 The project concludes with the framework ready for the installation of the cedar planks.19:37

Ver en YouTube

Más de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmar 2026Progressive Bevelingfeb 20261958 Harley Davidson Panhead Motorcycle - For Salefeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesene 2026

De Tips from a Shipwright — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema