Sailing Yabávideo

Facing OBSTACLES before UNTYING the LINES (boat restoration is never easy) — Sailing Yabá 206

12 de mayo de 2024 · 23 min · 170K vistas

¿Qué cubre este video?

The crew of Yabá completes final restoration tasks in preparation for the vessel's departure. Ben and MP install a custom-fitted gimbal stove in the galley, securing the unit with brackets to prevent sliding.4:03 Ben fabricates a new wooden mounting plate for the masthead lights, sourcing Purple Heart timber from Toninho's shipyard to replace a damaged component.10:24 He paints the new masthead piece and the top section of the mast in seafoam green, while also applying vinyl decals to the hull.14:45 The crew installs the anchor and tricolor lights at the masthead, using new wiring and securing the assembly with zip ties as a temporary measure.21:36 These repairs conclude the boat's refit list, finalizing the vessel for its upcoming maiden voyage.22:04

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema