Sailing Umavidéo

We're Cutting Off our Keel (Part 1 of 4) | Step 448

13 juillet 2025 · 37 min · 142K vues

Ce que couvre cette vidéo

The owners of a Pearson 36 are dropping the vessel's 6,000-pound lead keel to inspect and replace the keel bolts, a project they have deferred for 10 years. The boat previously suffered grounding damage that caused the keel to wobble, leading the crew to reinforce the hull with five additional fiberglass floors. To prepare for the removal, the crew is grinding away layers of paint, fairing compound, and gel coat around the hull-keel joint to expose the connection. Inside the bilge, they are removing old resin and debris to access the keel bolt nuts, which require a deep-reach socket for removal. The plan involves bracing the keel from the outside, lifting the boat to separate the joint, and installing G10 backing plates to distribute the load for the new bolts. The crew is performing this work in a refit environment, using temporary air conditioning and protective suits to manage fiberglass dust during the grinding process.

Regarder sur YouTube

Bateaux dans cette vidéo

Pearson Yachts 36Leur bateau

Plus de vidéos de Sailing Uma

Our boat won’t look the same after this | Step 495août 2026The ONE Thing We Disagreed on This Entire Refit | Step 494août 2026We Owe You The Full Storyjuil. 2026We spent $10,000 on something Pretty | Step 493juil. 2026

De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème