Sailing Nervous- Starting Over!video

#283 Water Tank Project- Start to Finish

25 settembre 2021 · 14 min · 1K visualizzazioni

Cosa tratta questo video

The crew of Nervous- Starting Over! refurbishes their starboard fiberglass water tank to address internal black mold and gel coat degradation.0:36 After removing and disposing of the port tank, they prepare the remaining unit by grinding away loose gel coat and exposed laminate on the tank fins, stopping once the fiberglass substrate is reached.0:25 They use a jigsaw to cut new access ports into the tank lid, then clear the balsa coring using a custom-made tool fashioned from aluminum bar stock and a bolt.5:39 To resolve issues with incompatible British pipe thread fittings, they drill a new one-inch hole to install a standard through-hull fitting, using a multi-tool to flatten the fiberglass surface for a secure nut seat.10:16 The project concludes with the installation of a new water pump and the beginning of the plumbing process.10:42 Proper surface preparation and the use of epoxy to seal exposed laminate ensure the structural integrity of the fiberglass tank.

Guarda su YouTube

Altro da Sailing Nervous- Starting Over!

My Dad and Me — Before Everything Changedset 2026Could I Start Over Here?ago 2026Drunken Sailorago 2026Starting Over at 65 - The Hardest Chaptersago 2026

Da Sailing Nervous- Starting Over! — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema