The Lazy Geckos ™ video
Rigging Repairs & Bowline Work! - Lazy Gecko VLOG 35
24 settembre 2016 · 13 min · 72K visualizzazioni · Tampa, Florida
Cosa tratta questo video
Rigging repairs on the vessel include replacing an elongated clevis pin and adjusting shroud tension to address surveyor findings before a planned Gulf Stream crossing.5:34 The process involves applying Tefgel to prevent galvanic corrosion on dissimilar metals and ensuring cotter pins are oriented with the head upward to prevent accidental backing out.2:25 Tension on the cap shrouds is increased from 12% to 16% using a tension gauge, while lower shrouds are balanced to pull equally in four directions.6:38 Final tuning requires sea trials; if the leeward shroud goes slack while sailing close-hauled with the main and genoa, the crew must tighten the turnbuckles in equal increments until the slack disappears.8:07 Additionally, the crew practices tying a bowline knot around their waists while in a pool to simulate a man overboard recovery scenario.9:15 Proper knot technique requires passing the line through the loop, around the standing part, and back through the loop to secure the line effectively under physical exertion.11:00
Altro da The Lazy Geckos ™
Da The Lazy Geckos ™ — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



