MJ Sailingvideo
Installing Our Prop Shaft & Building the Skeg (MJ Sailing - Ep 292)
8 luglio 2023 · 18 min · 66K visualizzazioni · Kent Island
Cosa tratta questo video
Installing a Vetus stainless duplex steel prop shaft and fiberglass stern tube requires precise alignment through the hull’s deadwood to maintain a 7.5-degree shaft angle.1:32 After drilling a pilot hole, the process involves using a hole saw and die grinder to enlarge the opening through thick fiberglass bulkheads.0:57 To ensure proper clearance for 16-inch feathering props—chosen over folding props to improve regeneration efficiency—the installation requires approximately 30 millimeters of clearance from the taper.8:30 The structural support for the stern tube consists of high-density foam panels bonded to the hull, shaped into a foil-like deadwood, and reinforced with three layers of 1708 fiberglass cloth.7:47 The foam core is sanded to a streamlined profile before the final glassing stage.10:33 Proper compression strength for the stern tube is achieved by backfilling the structure with thickened resin and glassing it directly to the hull.17:26
Altro da MJ Sailing
Da MJ Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



