Altro
Lingua
Modalità di visualizzazione
9 maggio 2026 · 14 min · 4K visualizzazioni · Queensland
Cosa tratta questo video
A 9.5-meter Kerr Dragon catamaran was transported by road and relaunched at the Caboolture River in Queensland, Australia, after a year of maintenance on the hard.▶ 0:25 The owner utilized a tilt tray truck and a low-loader semi-trailer to move the hull and the mast separately, keeping the load width at 4 meters to avoid special convoy permits.▶ 2:13 A crane lifted the 3-tonne vessel from the truck bed directly into the water at a public boat ramp.▶ 0:47 Rigging was reassembled on-site, with turnbuckles pre-taped to ensure correct tension upon re-stepping the mast.▶ 8:33 Maintenance performed during the haul-out included stripping 25 years of antifouling, applying eight layers of Coppercoat, replacing a rotted transom with Nitecore and epoxy, and installing stainless steel grab rails and rigid water tanks.▶ 10:57 The project concluded with the vessel motoring to an anchorage in preparation for a passage to New Caledonia or Vanuatu.▶ 12:42
Altro da Sailing Learning By Doing
Da Sailing Learning By Doing — guarda la barca, l'equipaggio e ogni video analizzato del canale.