Sailing Yabávideo
Future sailing plans begin with this map — Sailing Yabá 238
7 dicembre 2024 · 15 min · 40K visualizzazioni · Tsinghua, Brazil
Cosa tratta questo video
The crew of Yabá continues a series of boat refit projects while anchored in a bay near the river of Biguaçu, Brazil.1:16 The primary tasks include installing volcanic stone tiles in the shower enclosure and mounting a decorative dive map on the cabin wall.3:31 To prepare the wall for the map, the crew sands through layers of historical paint—including orange primer, green, blue, and white—to expose the underlying cedar, purple heart, and ash wood.4:59 They plan to seal the wood to prevent water ingress.5:56 The shower project involves cutting and setting individual natural stones, a process requiring precise trimming with a grinder.12:24 The crew also plans to install a saltwater washdown hose at the bow to manage mud accumulation from the anchor.1:44 Logistics remain a challenge at anchor, as running out of Sica adhesive forces a work stoppage that would be easily avoided in a shipyard.13:56 The crew intends to complete the plumbing and shower finish before moving to a shipyard for davit welding.1:16
Altro da Sailing Yabá
Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



