Catamaran Mistertong video

#235 The same ones again and here we go again...

14 luglio 2026 · 52 min · 9K visualizzazioni

Cosa tratta questo video

The owners of a catamaran complete the structural modifications to the boat's stern skirts, finalizing the fiberglass work on the transom extensions. The project involved building wooden forms to establish the angle of the transom, filling gaps with Erex foam, and applying multiple layers of fiberglass to ensure structural integrity and watertightness.1:14 To protect the hull from wave impact, the crew installed wooden cleats near the portlights, which act as buffers against incoming seas.9:17 The team also integrated custom-shaped handholds into the curves of the new skirts to improve ergonomics and safety for boarding.17:43 Throughout the process, the owners prioritized precise alignment and symmetry between the port and starboard sides, using a bubble level to maintain consistent geometry while the boat remained on the hard.1:26 The final phase of the work included sanding, fairing, and preparing the surfaces for future application of Coppercoat antifouling.27:19 By completing these modifications while the vessel was already hauled out, the owners avoided the need for an additional, costly yard period.43:21

Guarda su YouTube

Altro da Catamaran Mistertong

#258 Between interviews, small jobs, and paperwork...set 2026#257 When things don't go as expected....set 2026#255 Between portholes and delicacies ...set 2026#254 Sailing trip, reunion, back to work and beauty ....set 2026

Da Catamaran Mistertong — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema