VOILIER ODINvideo
THERMAL INSULATION
31 marzo 2024 · 28 min · 8K visualizzazioni
Cosa tratta questo video
Installing thermal and acoustic insulation in a steel boat requires extensive measuring, precise cutting, and tedious fitting of small pieces into tight, irregular spaces.Watch The project involves lining the interior of storage lockers, the anchor locker, and areas surrounding electrical and engine compartments to mitigate thermal bridging and dampen noise.3:38 The installer uses 15mm-thick adhesive insulation sheets, which provide effective thermal resistance and sound deadening but prove difficult to apply due to their aggressive adhesive backing.12:43 Because the material is fragile and difficult to reposition once stuck, the work requires careful planning and the use of small, manageable segments rather than large sheets.0:44 The process involves creating custom wood battens to frame the insulation and provide a base for future interior paneling.16:52 Despite the labor-intensive nature of the installation, the insulation noticeably reduces the time required to heat the cabin and dampens ambient noise.4:45 Proper surface preparation and the use of adhesive sealants like Sikaflex ensure the material remains secure in confined, non-square areas.19:13
Altro da VOILIER ODIN
Da VOILIER ODIN — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



