Sailing Umavideo
DUST LIFE: Surviving 12 Days of Torture | Step 361
8 settembre 2023 · 22 min · 121K visualizzazioni · Sardinia
Cosa tratta questo video
Renovating the hull of the 36-ft sailboat Uma requires grinding the entire interior surface down to bare fiberglass to prepare for new structural laminations.1:06 After confirming the structural integrity of the existing laminate via ultrasound, the crew spends two weeks removing old paint, contact adhesive, and tabbing from bow to stern.0:35 To manage the hazardous dust in a marina setting, they use grinders equipped with vacuum-shrouded dust guards, though the vacuum cleaners frequently overheat and clog.10:13 For the V-berth, the crew opts to work without vacuums while wearing protective bunny suits, relying on noise-canceling headphones and ear muffs to mitigate the extreme noise and heat inside the enclosed hull.11:48 They remove approximately 150 pounds of fiberglass dust during the process.19:54 To maintain morale and physical health, the crew alternates between intense grinding sessions and days off for computer work and rest.17:38 The completion of this phase allows the project to transition from demolition to structural design and interior reconstruction.18:25
Altro da Sailing Uma
Da Sailing Uma — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



