Sailing Squibvideo

Squib's Refit - Episode 33

31 agosto 2023 · 18 min · 980 visualizzazioni

Cosa tratta questo video

Peter and Sabina are refitting their aging pocket catamaran, Squib, with a focus on structural reinforcement for a new Windpilot self-steering system.0:09 The crew removed the stern railing and the old Aries windvane mount, which had caused stress cracks in the gelcoat.0:29 Peter reinforced the transom by laminating wooden support boards and filling old mounting holes with thickened epoxy.4:42 He sanded the platform, applied two layers of 300g fiberglass cloth to the damaged areas, and created fillets to ensure structural integrity.10:08

Beyond the stern work, Peter installed support battens in the cabin to prepare for ceiling panel installation and prepped the forward hatches for mounting.12:30 He used a custom-built template to test the positioning of the Windpilot and a boarding ladder, ensuring the rudder arm clears the ladder during operation.14:41 Peter plans to consult Peter Förthmann of Windpilot regarding the mounting geometry.17:15 The project also includes building a new battery box and adapting a solar panel to streamline the electrical setup.11:37

Structural reinforcement of the transom is essential to prevent stress cracking when installing a heavy self-steering system on a fiberglass hull.

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engineott 2026Sailing Squib - May 2026 /4ott 2026Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema