Ravenswingvideo

F25C trimaran rebuild - mast step & sheave boxes, fiberglass mold-making, soft padeyes - lots to do!

29. august 2023 · 21 min · 2K visninger

Hva denne videoen dekker

A F25C trimaran undergoes a series of structural and hardware upgrades in preparation for stepping the mast. The owner reinforces the daggerboard trunk-to-deck connection and compression post using carbon fiber and G10 plates.0:37 To facilitate mast raising, the project includes installing a custom mast-base pivot point and a permanent socket on the mast wall.19:29 The owner upgrades the jib and spinnaker halyard exit sheaves with Harken hardware, utilizing a trolley system to position backing plates inside the mast wall.6:44

Additional work includes fabricating fiberglass cockpit cubby boxes using a wooden mold coated with PVA release agent and polyester resin.13:15 The owner also installs G10 tube inserts for float-hull padeyes and prepares a foam-core carbon panel to create an emergency equipment tunnel.18:08 The mast is currently staged on sawhorses, with temporary blocking shaped from scrap mast sections to secure the base during the upcoming lift.19:01 These modifications aim to finalize the boat's rigging and storage systems before the first mast step in 23 years.

Se på YouTube

Mer fra Ravenswing

F32R carbon tri build project for saleokt. 2026A Labrador & her people go sailingdes. 2025An Uncle meets his Nephew sailing, part 2nov. 2025An uncle meets his nephew during a sailing cruiseokt. 2025

Fra Ravenswing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem