Ravenswingvídeo

F25C trimaran rebuild - mast step & sheave boxes, fiberglass mold-making, soft padeyes - lots to do!

29 de agosto de 2023 · 21 min · 2K visualizações

O que este vídeo aborda

A F25C trimaran undergoes a series of structural and hardware upgrades in preparation for stepping the mast. The owner reinforces the daggerboard trunk-to-deck connection and compression post using carbon fiber and G10 plates.0:37 To facilitate mast raising, the project includes installing a custom mast-base pivot point and a permanent socket on the mast wall.19:29 The owner upgrades the jib and spinnaker halyard exit sheaves with Harken hardware, utilizing a trolley system to position backing plates inside the mast wall.6:44

Additional work includes fabricating fiberglass cockpit cubby boxes using a wooden mold coated with PVA release agent and polyester resin.13:15 The owner also installs G10 tube inserts for float-hull padeyes and prepares a foam-core carbon panel to create an emergency equipment tunnel.18:08 The mast is currently staged on sawhorses, with temporary blocking shaped from scrap mast sections to secure the base during the upcoming lift.19:01 These modifications aim to finalize the boat's rigging and storage systems before the first mast step in 23 years.

Assistir no YouTube

Mais de Ravenswing

F32R carbon tri build project for saleout. de 2026A Labrador & her people go sailingdez. de 2025An Uncle meets his Nephew sailing, part 2nov. de 2025An uncle meets his nephew during a sailing cruiseout. de 2025

De Ravenswing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema