RAN Sailingvideo

Leveling The Hull & Getting Organized - Ep. 397 RAN Sailing

7. juni 2024 · 18 min · 154K visninger · Skåne

Hva denne videoen dekker

Johan and Malin continue the construction of their 50-foot sailboat by leveling the hull within their barn workshop. After maneuvering the hull into position, Johan removes the transport wheels and lowers the cradles to the floor.1:49 He uses a laser and internal frame markings to establish a precise horizontal reference plane for the waterline, adjusting the bow height by approximately 10 millimeters to achieve an accurate level.3:01 This alignment serves as the primary reference point for all future interior construction and deck installation.4:37 Following the leveling, the project shifts to organizing the barn workspace, including the construction of storage shelving for tools and materials to clear floor space for a dedicated workshop.5:59 The pair then travels to Stockholm to visit the Vasa Museum, where they examine the 1628 warship Vasa, noting its history of instability due to insufficient ballast and open gun ports.10:39

Se på YouTube

Mer fra RAN Sailing

Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran Sailingsep. 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sep. 2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaug. 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaug. 2026

Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem