RAN Sailingvideo

This Is Where Boat Builds Break People - Ep. 501 Ran Sailing

28. august 2026 · 25 min · 99K visninger · Skåne

Hva denne videoen dekker

Johan and Malin continue the fairing and lamination process on their boat build, focusing on the deckhouse, cockpit, and stern. To expedite the labor-intensive sanding of curved surfaces, Johan modifies a pneumatic dual-piston straight-line sander by attaching a flexible Flexisander base.12:17 The resulting tool proves too violent and vibrates excessively, leading him to revert to the original rigid base for flat areas while continuing to hand-sand curved sections.15:38 Lamination work involves applying two layers of carbon fiber followed by two layers of 600-gram biaxial fiberglass to the PET foam deckhouse interior.16:13 Johan also calibrates a CO2 laser cutter for precision work with plywood and acrylic.0:29 The project requires significant quantities of 407 low-density filler, with seven kilograms consumed during the current phase.24:20 The crew balances this repetitive construction work with hikes in Maglehem to maintain motivation during the long-term build.9:29

Se på YouTube

Mer fra RAN Sailing

Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaug. 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaug. 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailingaug. 2026From Laser Precision to Endless Sanding - Ep. 497 Ran Sailingjuli 2026

Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem