Wildling Sailingvideo

I Lifted Her Out For a Very Important Rebuild.

18. september 2026 · 25 min · 104K visninger · Netherlands

Hva denne videoen dekker

A catamaran undergoes a major structural refit in a boatyard, beginning with a haul-out to address hull rot and barnacle accumulation.6:18 After moving from a mooring to an anchorage, the boat is lifted via travel lift, requiring careful positioning to manage the compression forces on the hulls.6:38 The owner identifies significant rot in the daggerboard slots, necessitating the removal of water-logged foam core and damaged plywood.17:55 The repair plan involves excavating the affected areas, installing new stringers for structural support, and converting the daggerboard slots into accessible hatches.18:20 The owner sources 9mm waterproof marine plywood and structural epoxy, opting for lower-cost alternatives to premium brands like West System.23:47 Additional planned repairs include addressing rot near the aft sections and replacing a rubbing strip.24:37 Despite a week-long delay caused by a severe tooth infection requiring antibiotics, the project proceeds with a focus on methodical, weather-dependent epoxy work.22:51

Se på YouTube

Mer fra Wildling Sailing

One Final Refit Before Crossing The Atlantic.aug. 20262 Days Alone at Sea On my Primitive Double-Canoe.aug. 2026A Night Passage Through Orca Territoryjuli 2026Getting Very Comfortable Solo Sailing My Big Catamaranjuli 2026

Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem