Wildling Sailingvídeo

I Lifted Her Out For a Very Important Rebuild.

18 de septiembre de 2026 · 25 min · 117K visitas · Netherlands

Qué cubre este vídeo

A catamaran undergoes a major structural refit in a boatyard, beginning with a haul-out to address hull rot and barnacle accumulation.6:18 After moving from a mooring to an anchorage, the boat is lifted via travel lift, requiring careful positioning to manage the compression forces on the hulls.6:38 The owner identifies significant rot in the daggerboard slots, necessitating the removal of water-logged foam core and damaged plywood.17:55 The repair plan involves excavating the affected areas, installing new stringers for structural support, and converting the daggerboard slots into accessible hatches.18:20 The owner sources 9mm waterproof marine plywood and structural epoxy, opting for lower-cost alternatives to premium brands like West System.23:47 Additional planned repairs include addressing rot near the aft sections and replacing a rubbing strip.24:37 Despite a week-long delay caused by a severe tooth infection requiring antibiotics, the project proceeds with a focus on methodical, weather-dependent epoxy work.22:51

Ver en YouTube

Más de Wildling Sailing

One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026A Night Passage Through Orca Territoryjul 2026Getting Very Comfortable Solo Sailing My Big Catamaranjul 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema