VOILIER ODINvideo
KITCHEN FINISH AND REASSEMBLY
12. mars 2023 · 30 min · 5K visninger
Hva denne videoen dekker
The owner of the sailboat Odin completes a six-week custom galley renovation, focusing on structural assembly, finishing, and hardware installation.15:34 The project involves mounting cabinet doors, securing a sink, and installing aluminum trim to cover wood imperfections and prevent condensation.13:40 To protect the sink basin, the builder lines the underside with thick, repurposed linoleum secured with double-sided tape.1:49 The sink installation includes a dedicated seawater tap alongside the freshwater faucet, with the builder opting for a mastic-based sealant rather than the provided gaskets.7:13 To ensure durability during navigation, the builder reinforces the cabinetry with aluminum brackets and plans to install stainless steel grab rails near the stove for stability in heavy seas.14:47 Future tasks include plumbing the water tanks to the pumps, finalizing the electrical wiring, and beginning the bathroom renovation.16:30 The builder emphasizes the importance of completing minor finishing details, such as corner trim and painting, immediately to avoid long-term neglect.23:28
Båter i denne videoen
Mer fra VOILIER ODIN
Fra VOILIER ODIN – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



