VOILIER ODINvidéo

KITCHEN FINISH AND REASSEMBLY

12 mars 2023 · 30 min · 5K vues

Ce que couvre cette vidéo

The owner of the sailboat Odin completes a six-week custom galley renovation, focusing on structural assembly, finishing, and hardware installation.15:34 The project involves mounting cabinet doors, securing a sink, and installing aluminum trim to cover wood imperfections and prevent condensation.13:40 To protect the sink basin, the builder lines the underside with thick, repurposed linoleum secured with double-sided tape.1:49 The sink installation includes a dedicated seawater tap alongside the freshwater faucet, with the builder opting for a mastic-based sealant rather than the provided gaskets.7:13 To ensure durability during navigation, the builder reinforces the cabinetry with aluminum brackets and plans to install stainless steel grab rails near the stove for stability in heavy seas.14:47 Future tasks include plumbing the water tanks to the pumps, finalizing the electrical wiring, and beginning the bathroom renovation.16:30 The builder emphasizes the importance of completing minor finishing details, such as corner trim and painting, immediately to avoid long-term neglect.23:28

Regarder sur YouTube

Bateaux dans cette vidéo

Etap 38iLeur bateau

Plus de vidéos de VOILIER ODIN

TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONaoût 2026WHY I'M MOVING BACK TO FRANCEjuil. 2026THIS IS ALSO WHAT BOAT LIFE IS LIKEjuin 2026BETWEEN DUNES and SHIPWRECK MUSEUMjuin 2026

De VOILIER ODIN — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème