Sailing Squibvideo

Squib's Refit - Episode 46

21. desember 2023 · 17 min · 1K visninger

Hva denne videoen dekker

The refit of the pocket catamaran Squib involves installing new windows, reinforcing structural components, and preparing for systems installation. To install the windows, the crew cleans the frames with water and acetone before applying SICKER Activator 205.1:49 They use suction cups to position the glass and apply adhesive sealant, smoothing the bead with a finger to ensure a clean, watertight seal.4:15 After successfully mounting three windows previously, they complete the remaining two, noting that the process requires significant sealant and careful tensioning.9:58

Beyond window installation, the project includes structural reinforcements. The crew bonds fiberglass patches to the winch pedestals using epoxy.12:50 They also mount wooden blocks beneath the deck to serve as anchor points for future cable conduits and gas lines, securing these blocks with screws before sealing the holes with thickened epoxy.14:37 Additional work involves reinforcing the winch support tubes with multiple layers of fiberglass matting.15:56 Future tasks include installing a budget-friendly diesel heater and a bilge pump.16:51

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engineokt. 2026Sailing Squib - May 2026 /4okt. 2026Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem