Sailing Squibvideo

Sailing Squib - May 2026 /4

1. oktober 2026 · 19 min · 17 visninger

Hva denne videoen dekker

Refitting the interior and exterior of the boat Squib involves installing a new water heater, mounting outboard motor brackets, and finishing cabin paneling. The owner installs a new water heater by securing it to the existing bulkhead, requiring only minor drilling and plumbing connections.Watch He fabricates and mounts custom brackets for both a gasoline and an electric outboard motor, ensuring clearance for the shower hose hatch.2:13 Interior work includes installing white panels over previously raw wood surfaces and constructing a custom housing for the wind instrument, which requires shortening the data cable and securing the mounting bracket with perforated metal strapping.5:00 To improve mast rake and backstay tension, the owner fabricates two stainless steel plates for the forestay, drilling 10mm holes using cobalt bits and manual cooling techniques.14:31 Additionally, he discovers the rudder has jumped its lower mounting point while the boat is on the hard, likely due to external impact from construction machinery, and plans to use a car jack and wooden block to realign it.18:36

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem