Sailing Squibvideo

Squib's Refit - Thru-hulls - Galley - Organizing - Apricot Dumplings /92

7. november 2024 · 16 min · 965 visninger

Hva denne videoen dekker

The refit of the vessel *Squib* focuses on installing a custom galley drawer unit beneath the stove and preparing the hull for new through-hull fittings. To install the drawer, the owner sands down excess paint and wood along the drawer’s runners to ensure a smooth fit, opting for simple wooden slides over ball-bearing rails to prevent corrosion.8:57 After achieving a fit, the unit is secured with screws and sealed with epoxy fillets to prevent debris from falling behind the cabinetry.14:30 The drawer unit sits slightly higher than the adjacent refrigerator, a misalignment accepted to avoid rebuilding the structure.14:54 Separately, the crew addresses through-hull fittings removed in 2022.2:26 The owner grinds away old sealant and filler from the hull penetrations, using a Dremel tool to clean the edges and preparing the surfaces for new fittings.5:09 The work includes filling surface nicks and cracks in the laminate with epoxy filler.6:41 The project concludes with the organization of various hardware and fasteners salvaged from previous refit stages.6:56

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem