Sailing Squibvídeo

Squib's Refit - Thru-hulls - Galley - Organizing - Apricot Dumplings /92

7 de novembro de 2024 · 16 min · 966 visualizações

O que este vídeo aborda

The refit of the vessel *Squib* focuses on installing a custom galley drawer unit beneath the stove and preparing the hull for new through-hull fittings. To install the drawer, the owner sands down excess paint and wood along the drawer’s runners to ensure a smooth fit, opting for simple wooden slides over ball-bearing rails to prevent corrosion.8:57 After achieving a fit, the unit is secured with screws and sealed with epoxy fillets to prevent debris from falling behind the cabinetry.14:30 The drawer unit sits slightly higher than the adjacent refrigerator, a misalignment accepted to avoid rebuilding the structure.14:54 Separately, the crew addresses through-hull fittings removed in 2022.2:26 The owner grinds away old sealant and filler from the hull penetrations, using a Dremel tool to clean the edges and preparing the surfaces for new fittings.5:09 The work includes filling surface nicks and cracks in the laminate with epoxy filler.6:41 The project concludes with the organization of various hardware and fasteners salvaged from previous refit stages.6:56

Ver no YouTube

Mais de Sailing Squib

Sailing Squib - May 2026/309/2026Sailing Squib May 2026 /208/2026Sailing Squib - Contemporary Witness07/2026Sailing Squib - May 2026 /107/2026

De Sailing Squib — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema