Entre Terras e Maresvideo

ep 115 s1 between lands and seas kitchen cabinets

7. april 2024 · 8 min · 305 visninger · Guarujá

Hva denne videoen dekker

Edgar continues the interior construction of his boat, focusing on the galley cabinetry and sink installation.3:41 He completes two kitchen cabinets and mounts the sink, which includes a built-in trash bin and soap dispenser.3:50 The cabinet doors are cut and fitted, though final installation awaits the arrival of hinges.7:05 The countertop edges require additional time for the epoxy to cure fully before final finishing can occur.5:30 The project remains a work in progress as the crew prepares to install the faucet.5:26 Edgar reflects on the long-term nature of the build, noting that the construction process is slower than originally planned.1:36 He emphasizes the importance of pursuing personal goals despite the physical demands and challenges of boat building.2:22

Se på YouTube

Mer fra Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juli 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juni 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juni 2026This week the focus was on something elsejuni 2026

Fra Entre Terras e Mares – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem