Entre Terras e Maresvídeo

ep 115 s1 between lands and seas kitchen cabinets

7 de abril de 2024 · 8 min · 305 visitas · Guarujá

Qué cubre este vídeo

Edgar continues the interior construction of his boat, focusing on the galley cabinetry and sink installation.3:41 He completes two kitchen cabinets and mounts the sink, which includes a built-in trash bin and soap dispenser.3:50 The cabinet doors are cut and fitted, though final installation awaits the arrival of hinges.7:05 The countertop edges require additional time for the epoxy to cure fully before final finishing can occur.5:30 The project remains a work in progress as the crew prepares to install the faucet.5:26 Edgar reflects on the long-term nature of the build, noting that the construction process is slower than originally planned.1:36 He emphasizes the importance of pursuing personal goals despite the physical demands and challenges of boat building.2:22

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema