Sailing Supernovavideo

Sometimes it doesn't go your way [Ep. 168]

16. oktober 2026 · 35 min · 20K visninger · Northern New South Wales

Hva denne videoen dekker

The crew of Supernova performs maintenance on their dinghy and installs a custom diving board while anchored in Sint Maarten. To repair the dinghy, they remove the tubes, clean the fabric with a solvent from Polymarine, and apply a two-part adhesive while the pontoons are inflated to ensure a proper bond.12:56 The repair requires 48 hours to cure.14:17

For the diving board project, the crew sources stainless steel parts from FKG Rigging and helicoils from Antillium Paint to mount the structure to the boat.14:50 They construct a springboard mechanism using repurposed dock springs, welding the components to the deck.19:46 After installation, the springboard fails during initial testing, as the springs lack the necessary structural integrity for the load.33:27 The crew decides to abandon the spring mechanism in favor of a hard-mounted diving board.34:46 Additionally, the crew installs a new stack pack sail bag, which requires drilling into the mast for attachment.2:09

Se på YouTube

Mer fra Sailing Supernova

It was 100% my fault [Ep. 167]okt. 2026So much pain! [Ep. 166]okt. 2026How solo sailors die [Ep. 165]sep. 2026Hurricane prep gone wrong [Ep. 164]sep. 2026

Fra Sailing Supernova – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem