Sailing Supernovavidéo
Sometimes it doesn't go your way [Ep. 168]
16 octobre 2026 · 35 min · 20K vues · Northern New South Wales
Ce que couvre cette vidéo
The crew of Supernova performs maintenance on their dinghy and installs a custom diving board while anchored in Sint Maarten. To repair the dinghy, they remove the tubes, clean the fabric with a solvent from Polymarine, and apply a two-part adhesive while the pontoons are inflated to ensure a proper bond.12:56 The repair requires 48 hours to cure.14:17
For the diving board project, the crew sources stainless steel parts from FKG Rigging and helicoils from Antillium Paint to mount the structure to the boat.14:50 They construct a springboard mechanism using repurposed dock springs, welding the components to the deck.19:46 After installation, the springboard fails during initial testing, as the springs lack the necessary structural integrity for the load.33:27 The crew decides to abandon the spring mechanism in favor of a hard-mounted diving board.34:46 Additionally, the crew installs a new stack pack sail bag, which requires drilling into the mast for attachment.2:09
Plus de vidéos de Sailing Supernova
De Sailing Supernova — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



