Mer
Språk
Visningsmodus
Project Brupegvideo
13. mai 2026 · 41 min · 25K visninger · Horn Island
Hva denne videoen dekker
A converted steel fishing trawler, Brupeg, takes on fuel and water at Thursday Island's commercial wharf before heading south into 15–25 knot trade wind headwinds.▶ 0:10 The crew loads 5 tonnes of water into the forward tanks and 620 litres of diesel into the aft tanks at the wharf, but 2 tonnes of diesel already sitting in the forward storage tanks leaves the bow heavy and the stern corners out of the water — a trim problem that demands a fuel transfer before departure.▶ 5:33 The episode documents the full installation and first use of a 750-watt, 240-volt electric fuel transfer pump rated at 75 litres per minute.▶ 11:24 The pump connects via one-inch rubber hose to existing stainless pipes that run under the freezer room and through a cofferdam from the forward storage tanks to the engine room.▶ 11:38 Plumbing in the cofferdam links the port and starboard forward tanks with half-inch ball valves, allowing either tank to drain independently or together.▶ 18:12 A 3D-printed mount holds a three-way ball valve for a planned full one-inch transfer system not yet complete.▶ 16:08 The pump runs successfully on first use with no leaks, pulling diesel aft and visibly improving trim.▶ 21:24 The planned route south involves sheltering at Flinders Island for up to two weeks before bashing down to Cairns.▶ 23:16
Mer fra Project Brupeg
Fra Project Brupeg – se kanalens båt, mannskap og alle analyserte videoer.