Sailing Squibvideo

Squib's Refit - Closing the exhaust hole in the bridge deck - Filling cracks - Painting the front cabin /74

4. juli 2024 · 19 min · 887 visninger

Hva denne videoen dekker

Refitting the pocket catamaran Squib involves structural repairs to the deck and interior cabin renovation. To seal a hole in the bridge deck, the crew grinds the edges down to the laminate, inserts a custom-cut wooden plug, and reinforces the area with multiple layers of fiberglass matting and thickened epoxy.1:39 They also drill out and fill old screw holes with epoxy to ensure structural integrity.1:52 After sanding the repairs flush, the crew cleans the surfaces with acetone to remove dust before applying two coats of primer to the forward cabin.8:08 They use a 4:1 ratio epoxy-based paint, stirring the mixture thoroughly to incorporate settled pigments.9:30 Final finishing includes sanding the primed surfaces with 400-grit paper and applying a topcoat using specialized rollers to achieve a smooth finish.18:01 The project concludes with the installation of trim strips and the removal of old adhesive remnants from the cabin ceiling to facilitate cable routing.18:47

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem