Sailing Squibvideo

Squib's Refit - Closing the exhaust hole in the bridge deck - Filling cracks - Painting the front cabin /74

4 luglio 2024 · 19 min · 887 visualizzazioni

Cosa tratta questo video

Refitting the pocket catamaran Squib involves structural repairs to the deck and interior cabin renovation. To seal a hole in the bridge deck, the crew grinds the edges down to the laminate, inserts a custom-cut wooden plug, and reinforces the area with multiple layers of fiberglass matting and thickened epoxy.1:39 They also drill out and fill old screw holes with epoxy to ensure structural integrity.1:52 After sanding the repairs flush, the crew cleans the surfaces with acetone to remove dust before applying two coats of primer to the forward cabin.8:08 They use a 4:1 ratio epoxy-based paint, stirring the mixture thoroughly to incorporate settled pigments.9:30 Final finishing includes sanding the primed surfaces with 400-grit paper and applying a topcoat using specialized rollers to achieve a smooth finish.18:01 The project concludes with the installation of trim strips and the removal of old adhesive remnants from the cabin ceiling to facilitate cable routing.18:47

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnesslug 2026Sailing Squib - May 2026 /1lug 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema