Hold Fast!video
S/V Quetzal - Challenges Come in Threes
6. juli 2020 · 17 min · 2K visninger · St. Michaels, Maryland
Hva denne videoen dekker
S/V Quetzal experiences three mechanical failures during a weekend cruise from Herring Bay to St. Michaels on the Chesapeake Bay. Before departure, an override on the in-boom furling drum prevents the mainsail from hoisting.1:59 The owner resolves this by removing the faceplate and guard to clear the fouled line.2:26 Upon arrival at St. Michaels, the coupling between the propeller shaft and the AquaDrive separates while shifting into reverse, caused by missing bolts.4:31 The owner recovers one bolt from the bilge and sources others to secure the forward and aft CV joints with five and three bolts respectively, allowing the vessel to motor back to its slip.13:04 During the stay, a nearby Beneteau Swift trawler drags anchor toward the vessel, requiring the crew to deploy fenders before the trawler’s owners move their boat.11:15 The crew successfully completes the return passage to Herring Bay by prioritizing sailing to minimize engine use while the drivetrain remains compromised.13:31
Båter i denne videoen
Mer fra Hold Fast!
Fra Hold Fast! – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



